30-DAY ROLLING • 30-DAY ROLLING WHERE ELIGIBLE • UK-BASED SUPPORT • SETUP FROM £0 WHERE AVAILABLE •

    Guide · 6 min · Last reviewed 5 Jul 2026

    Complete OCCTA order-to-activation guide

    In short

    A step-by-step walkthrough of everything that happens between placing an OCCTA order and your service going live.

    This guide walks through the full OCCTA journey, from postcode check to service-live.

    Step 1: Check availability

    Enter your postcode on our home page. We query Openreach in real time and show only the plans that will actually work at your address.

    Step 2: Pick a plan

    Choose speed and add-ons. Prices include VAT for home users.

    Step 3: Accept your Contract Summary

    We email a one-page Ofcom-format Contract Summary. Read it, tick the box, accept.

    Step 4: Pay setup (if any)

    Most home plans have no setup fee. Any charges are shown up-front.

    Step 5: Openreach appointment

    We book the earliest available slot — often within 10–14 days.

    Step 6: Router arrives

    Pre-configured. Plug into the master socket on activation day.

    Step 7: Activation

    Line goes live between 8am and 6pm on the booked date. No engineer needed for a simple line takeover; engineer attends for new-line installs.

    Step 8: 10-day auto-tune

    Line stabilises to its best sustainable speed over the first 10 days. Only test seriously after that.

    Step 9: First invoice

    Around your billing day. Usually pro-rata + one month in advance.

    Step 10: You're done

    Enjoy the internet. Talk to us if anything's off.

    Was this helpful?

    Still need help?

    Check availability at your address, or talk to a human.

    This guide is for general information only. Your accepted Contract Summary, Contract Information and OCCTA terms apply to your service.